Sort work packages and sub-work packages
By default, work packages and sub-work packages are displayed in the order in which you created them.
However, if you want to change the order:
Slide the screen down,
Press "Order",
Move the batch while holding down the icon representing three horizontal lines,
Press "Finish" to confirm.

Select work-packages menu
Select the pencil button then "change the order"
Move the cell to desired position

The same order will be reused on the planning.
However, if you want to change the order:
On iPad version :
Slide the screen down,
Press "Order",
Move the batch while holding down the icon representing three horizontal lines,
Press "Finish" to confirm.

On the web version (Google Chrome for example : https://web.archireport.com)
Select work-packages menu
Select the pencil button then "change the order"
Move the cell to desired position

The same order will be reused on the planning.
Updated on: 03/05/2022