Sort work packages and sub-work packages
By default, work packages and sub-work packages are displayed in the order in which you created them.
However, if you want to change the order:
Slide the screen down,
Press "Order",
Move the batch while holding down the icon representing three horizontal lines,
Press "Finish" to confirm.
![](https://storage.crisp.chat/users/helpdesk/website/eecd01387fadc000/2b50f822-8983-4c62-b71e-f252d9_11tuucj.png)
Select work-packages menu
Select the pencil button then "change the order"
Move the cell to desired position
![Reorder work-packages](https://storage.crisp.chat/users/helpdesk/website/9c0ece7370e6600/capture-decran-2022-05-03-a-11_18n90sw.jpg)
The same order will be reused on the planning.
However, if you want to change the order:
On iPad version :
Slide the screen down,
Press "Order",
Move the batch while holding down the icon representing three horizontal lines,
Press "Finish" to confirm.
![](https://storage.crisp.chat/users/helpdesk/website/eecd01387fadc000/2b50f822-8983-4c62-b71e-f252d9_11tuucj.png)
On the web version (Google Chrome for example : https://web.archireport.com)
Select work-packages menu
Select the pencil button then "change the order"
Move the cell to desired position
![Reorder work-packages](https://storage.crisp.chat/users/helpdesk/website/9c0ece7370e6600/capture-decran-2022-05-03-a-11_18n90sw.jpg)
The same order will be reused on the planning.